Economics homework… inputs and costs
The accompanying table shows a boat manufacturer’s total cost of producing boats.
Quantity of Boats |
Total Cost |
0 |
$ 450,000 |
1 |
$ 490,000 |
2 |
$ 510,000 |
3 |
$ 520,000 |
4 |
$ 540,000 |
5 |
$ 570,000 |
6 |
$ 610,000 |
7 |
$ 670,000 |
8 |
$ 750,000 |
9 |
$ 870,000 |
1. What is this manufacturer’s fixed cost?
2. For each level of output, calculate the variable cost (VC). For each level of output except zero output, calculate the average variable cost (AVC), average total cost (ATC), and average fixed cost (AFC)
Qty of boats |
Total Cost |
Variable Costs (a.) |
Average Variable Costs (b.) |
Average Total Costs (c.) |
Average Fixed Cost (d.) |
0 |
$450,000 |
– |
– |
– |
– |
1 |
490,000 |
|
|
|
|
2 |
510,000 |
|
|
|
|
3 |
520,000 |
|
|
|
|
4 |
540,000 |
|
|
|
|
5 |
570,000 |
|
|
|
|
6 |
610,000 |
|
|
|
|
7 |
670,000 |
|
|
|
|
8 |
750,000 |
|
|
|
|
9 |
870,000 |
|
|
|
|
3. What is the minimum-cost output?
4. For each level of output, calculate this manufacturer’s marginal cost (MC)
(For convenience, place the Marginal Cost between 0 and 1 boat on the second row, the Marginal Cost between 1 and 2 boats on the third row, and so on)
Qty of boats |
TC |
Marginal Costs |
0 |
$450,000 |
– |
1 |
490,000 |
|
2 |
510,000 |
|
3 |
520,000 |
|
4 |
540,000 |
|
5 |
570,000 |
|
6 |
610,000 |
|
7 |
670,000 |
|
8 |
750,000 |
|
9 |
870,000 |
|
———————
References:
Thanks for installing the Bottom of every post plugin by Corey Salzano. Contact me if you need custom WordPress plugins or website design.